Crane pulls bus from bridge wreckage

A crane lifts a Port Authority bus out of the wreckage of the Fern Hollow Bridge collapse.

By Ryan Deto

Trib Total Media

The operator of a towering crane pulled a 60-foot Port Authority bus from the wreckage of Pittsburgh’s Fern Hollow Bridge just before sunset Monday, punctuating a cleanup that also saw workers remove several other vehicles three days after the span collapsed.

To read the rest of the story, please see a copy of Tuesday’s Mon Valley Independent, call 724-314-0035 to subscribe or subscribe to our online edition at http://monvalleyindependent.com.